Pseudo-static slope stability analysis around the landslide at railway tunnel, South Sumatera, Indonesia
IOP Conference Series: Materials Science and Engineering 620 (1), 012129, 2019
MT Toha, D Setiabudidaya, MA Ghadafi, M Adiwarman, M Irvan
Citation : 0
Year : 2019 |
ANALISIS PENGARUH FRAGMENTASI PELEDAKAN OVERBURDEN TERHADAP PRODUKTIVITAS EXCAVATOR PC 1250-8 PADA TAMBANG BATUBARA PT MUARA ALAM SEJAHTERA KABUPATEN LAHAT SUMATERA SELATAN
Sriwijaya University, 2018
YJ AMIN, MT Toha
Citation : 0
Year : 2018 |
Kesiapan Daerah dalam Menunjang Kegiatan Pencairan Batubara PT. Tambang Batubara Bukit Asam (Persero)
Pusat Penelitian dan Pengembangan Teknologi Mineral dan Batubara, Jakarta 1Â …, 2002
M Hasjim, S Ismail, MT Toha
Citation : 0
Year : 2002 |
PENGARUH JARAK ANGKUT DAN GEOMETRI JALAN TERHADAP SISTEM PENERAPAN 2 JALUR ANGKUT BERDASARKAN PRODUKTIVITAS DAN KONSUMSI FUEL ALAT ANGKUT DUMP TRUCK CAT 773E DI PT. JRESOURCESÂ …
Sriwijaya University, 2020
IR TUNLIU, MT Toha, D Purbasari
Citation : 0
Year : 2020 |
Kajian Dampak Lingkungan Program Sumatera Selatan Sebagai Lumbung Energi Nasional
Proceeding TPT PERHAPI 2008, 2008
MT Toha
Citation : 0
Year : 2008 |
ANALISIS METODE RIPPING OVERBURDEN DENGAN BULLDOZER RIPPER D 375 A-5 SEBAGAI ALAT BANTU EXCAVATOR PC 2000 PADA PENAMBANGAN BATUBARA PIT TAL BARAT PT. PAMAPERSADA NUSANTARAÂ …
Sriwijaya University, 2018
W JUWITA, MT Toha, S Syarifudin
Citation : 0
Year : 2018 |
Potensi dan Prospek Bahan Galian Industri di Sumatera Selatan
Seminar dan Lokakarya Prospek Sumberdaya Alam Sumatera Selatan di Era …, 2002
MT Toha
Citation : 0
Year : 2002 |
EVALUASI METODE RIPPING TERHADAP FRAGMENTASI BATUBARA GUNA MENINGKATKAN EFFESIENSI EXCAVATOR BACKHOE (BREAKER) DI PIT MUARA TIGA BESAR UTARA PT. BUKIT ASAM, Tbk. TANJUNG ENIMÂ …
Sriwijaya University, 2020
ARIH GENESA, MT Toha, D Purbasari
Citation : 0
Year : 2020 |
The Prospect of the Development of Mine-Mouth Coal Fired Power Plant in Musi Banyuasin, South Sumatera
The 3rd International Conference and Exhibition of Coal Technology …, 2002
M Hasjim, S Ismail, MT Toha
Citation : 0
Year : 2002 |
PERENCANAAN KEBUTUHAN ALAT GALI MUAT DAN ANGKUT UNTUK MEMENUHI TARGET PRODUKSI LIMESTONE 1.000. 000 TON/TAHUN DI PIT 4142 PT. SEMEN INDONESIA (PERSERO) TBK SITE TUBAN, PROVINSIÂ …
Sriwijaya University, 2018
M MURSID, MT Toha, D Purbasari
Citation : 0
Year : 2018 |