Lewati ke konten
photo
photo

M. TAUFIK TOHA

Ilmu Teknik

NIDN/NIDK : 8864000016

Profesor

M. TAUFIK TOHA

Ilmu Teknik

NIDN/NIDK : 8864000016

Profesor

H-INDEX

WoS H-Index :

Scopus H-Index : 1

Google H-Index : 6

H-INDEX

WoS H-Index :

Scopus H-Index : 1

Google H-Index : 6

GS Documents

Source by Sinta Kemenristek

Total : 167

Analisis Kestabilan Lereng Dengan Pengaruh Getaran Tanah Akibat Peledakan Overburden di Pit South Tutupan PT ADARO INDONESIA
Sriwijaya University, 2019
MI FAJAR, T Toha, B Bochori
Citation : 1
Year : 2019
ANALISIS DISTRIBUSI FRAGMENTASI PELEDAKAN TANAH PENUTUP TERHADAP PRODUKTIVITAS ALAT GALI MUAT ELEKTRIFIKASI PC 3000 DI TAMBANG BATUBARA BANKO BARAT PT BUKIT ASAM TBK
Sriwijaya University, 2019
MF PEKIK MERDEKA, MT Toha, B Bochori
Citation : 0
Year : 2019
ANALISIS KETIDAKTERCAPAIAN DAN UPAYA MEMENUHI VOLUME PELEDAKAN TANAH PENUTUP DI PIT 2 DAN PIT 3 TAMBANG BATUBARA BANKO PT BUKIT ASAM TBK
Sriwijaya University, 2019
R PRANATA, T Toha, B Bochori
Citation : 0
Year : 2019
MANAJEMEN TRAFFIC JALAN ANGKUT BATUBARA DARI STOCKPILE KE JALAN PROVINSI SEJAUH 14 KILOMETER UNTUK MEMPERLANCAR PENGANGKUTAN BATUBARA DI PT. TANTRA COALINDO INTERNASIONAL …
Sriwijaya University
D RUKZA, T Toha, A Hak
Citation : 0
Year : 2019
CALCULATION OF PIT 2 PRODUCED OVERBURDEN VOLUME AND THE ANALYSIS OF PREPARATION OF PIT 1 MINE VOID UTILIZATION AT SUPAT BLOCK PT. BATURONA ADIMULYA MUSI BANYUASIN, SOUTH SUMATERA
Indonesian Journal of Environmental Management and Sustainability 2 (2), 42-47, 2018
E Harsiga, T Toha, S Komar
Citation : 0
Year : 2018
Study of Ground Vibration Reduction Using Fault Tree Analysis Method on Blasting Activity in PT. Semen Baturaja Persero, Tbk.
Sriwijaya Journal of Environment 3 (1), 27-30, 2018
JF Lubis, T Toha, N Ngudiantoro
Citation : 1
Year : 2018
ANALISIS METODE RIPPING UNTUK MENGOPTIMALKAN FRAGMENTASI BATUBARA DALAM RANGKA MENINGKATKAN PRODUKTIVITAS EXCAVATOR BACKHOE DI TAMBANG BANKO BARAT PT BUKIT ASAM (PERSERO), TBK
Jurnal Pertambangan 2 (3), 1-10, 2018
R Sebastian, T Toha
Citation : 1
Year : 2018
PERENCANAAN SISTEM PENYALIRAN PADA AREA STOCKPILE BATUBARA PT. MUARA ALAM SEJAHTERA DI TANJUNG BARU, PALEMBANG, SUMATERA SELATAN
Sriwijaya University, 2018
F AGINDRA, MT Toha, MA Abro
Citation : 0
Year : 2018
Evaluasi Kinerja Operasi Pengeboran dan Peledakan Terhadap Produktivitas Excavator di Quarry Karang Putih PT Semen Padang, Indarung
Jurnal Pertambangan 2 (3), 57-65, 2018
R Meidiantoni, MT Toha, D Purbasari
Citation : 6
Year : 2018
RENCANA SISTEM PENYALIRAN TAMBANG PADA TAMBANG BATUBARA PT. BATURONA ADIMULYA BLOK SUPAT KECAMATAN MUSI BANYUASIN SUMATERA SELATAN
Sriwijaya University, 2018
I GUNAWAN, MT Toha, MA Abro
Citation : 0
Year : 2018