Analisis Peledakan dan Kemajuan Front Bukaan pada Tambang Bawah Tanah Bijih Emas PT Cibaliung Sumberdaya, Pandeglang-Banten
Jurnal Pertambangan 1 (2), 2017
Hazzaliandiah, MT Toha, Bochori
Citation : 0
Year : 2017 |
Kajian Ulang Desain Separator Untuk Mencapai Target Produksi 1500 Bfpd Pada Oil Plant SG-09 PT. Energi Mega Persada (EMP) Gelam – Jambi
The Jurnal Pertambangan 1 (2), 2017
DDA Sukaryo, MT Toha, UA Prabu
Citation : 1
Year : 2017 |
Rancangan Sistem Waktu Tunda Peledakan Nonel Untuk Mengurangi Efek Getaran Tanah Terhadap Fasilitas Tambang
The Jurnal Pertambangan 1 (3), 2017
R Noviansyah, MT Toha, Bochori
Citation : 0
Year : 2017 |
Kajian Ulang Desain Separator Untuk Mencapai Target Produksi 1500 Bfpd Pada Oil Plant SG-09 PT. Energi Mega Persada (EMP) Gelam – Jambi
The Jurnal Pertambangan 1 (2)
DDA Sukaryo, MT Toha, UA Prabu
Citation : 1
Year : 2017 |
Analisis Kestabilan Lereng Menggunakan Metode Slope Mass Rating dan Metode Stereografis pada Pit Berenai PT. Dwinad Nusa Sejahtera (Sumatera Copper and Gold) Kabupaten Musi …
Jurnal Pertambangan 1 (5), 36-43, 2017
MT Toha, D Sudarmono
Citation : 6
Year : 2017 |
Redesign Mining Sequence on Basin Type Coal Deposit to Optimize Stripping of Overburden Cost
Yang Dinilai Reviewer I Reviewer II 101 (05007), 265, 2017
MT Toha
Citation : 0
Year : 2017 |
Redesign Mining Sequence on Basin Type Coal Deposit to Optimize Stripping of Overburden Cost”, Prosiding Sicest, 2016.
The 1st Sriwijaya International Conference on Engineering Sciences and …, 2016
MT Toha, Bochori
Citation : 0
Year : 2016 |
EVALUASI KINERJA DAN BIAYA SEWA ALAT EXCAVATOR BACKHOE KOMATSU PC 400 DAN PC 800 BERDASARKAN HOUR METER PADA KEGIATAN PENGGALIAN BATUBARA DI LOKASI PAL. 1 PT. BUKIT ASAMÂ …
Sriwijaya University, 2016
D SANDRA, T Toha, M Amin
Citation : 0
Year : 2016 |
Retensi dan Inovasi Fonologis Protobahasa Melayik pada Bahasa Melayu Tamiang
Ranah: Jurnal Kajian Bahasa 5 (1), 87-100, 2016
M Toha
Citation : 9
Year : 2016 |
EVALUASI KINERJA DAN BIAYA SEWA ALAT EXCAVATOR BACKHOE KOMATSU PC 400 DAN PC 800 BERDASARKAN HOUR METER PADA KEGIATAN PENGGALIAN BATUBARA DI LOKASI PAL. 1 PT. BUKIT ASAMÂ …
Sriwijaya University
D SANDRA, T Toha, M Amin
Citation : 0
Year : 2016 |