GS Documents
Source by Sinta Kemenristek
Total : 30
PERBANDINGAN DURASI DAN BIAYA PROYEK PELEBARAN JALAN MENGGUNAKAN METODE PENJADWALAN KURVA-S DAN LINE OF BALANCE (STUDI KASUS: PROYEK PELEBARAN JALAN NASIONAL KOTA MARTAPURAÂ …
Sriwijaya University, 2019
N APRILLIA, B Susanti, MF Toyfur
Citation : 0
Year : 2019 |
PEMILIHAN BENTUK MODEL PENILAIAN RISIKO BENCANA GEMPA BUMI UNTUK RUAS JALAN NASIONAL DI INDONESIA
Simposium II UNIID 2017 2 (1), 122-129, 2018
MF Toyfur, KS Pribadi, SS Wibowo, IW Sengara
Citation : 0
Year : 2018 |
Vulnerability factor in earthquake risk assessment model for roads in Indonesia
MATEC Web of Conferences 229, 03009, 2018
MF Toyfur, KS Pribadi, SS Wibowo, IW Sengara
Citation : 4
Year : 2018 |
IDENTIFIKASI PENYEBAB SISA MATERIAL KONSTRUKSI SERTA PENGENDALIANNYA PADA PROYEK JEMBATAN (Studi kasus: Proyek Jembatan Musi IV Palembang)
Sriwijaya University, 2018
N ARNESI, MF Toyfur
Citation : 0
Year : 2018 |
ANALISIS FAKTOR PENYEBAB KETERLAMBATAN PELAKSANAAN PROYEK KONSTRUKSI JEMBATAN (STUDI KASUS: PEMBANGUNAN JEMBATAN MUSI IV PALEMBANG)
Sriwijaya University, 2018
A ROSYADA, MF Toyfur
Citation : 0
Year : 2018 |
State of The Art Model Penilaian Risiko Bencana Gempa Bumi untuk Ruas Jalan di Indonesia
Andalas Civil Engineering (ACE) Conference 2014, 2018
MF Toyfur
Citation : 0
Year : 2018 |
Seismic risk assessment for road in Indonesia
AIP Conference Proceedings 1730 (1), 030006, 2016
MF Toyfur, KS Pribadi
Citation : 3
Year : 2016 |
MODEL PENGENDALIAN MATERIAL PADA INDUSTRI BETON READY MIX
Cantilever: Jurnal Penelitian dan Kajian Bidang Teknik Sipil 2 (1), 2007
MF Toyfur
Citation : 0
Year : 2007 |
ANALISA PERAN DAN FUNGSI MANDOR PADA PROYEK-PROYEK KONSTRUKSI JEMBATAN DAN GEDUNG DI KABUPATEN OGAN KOMERING ULU
R Vrayudha, MM Iqbal, MF Toyfur
Citation : 0
Year : 0 |
MOPML PENGENDALIAN MATERIAL PADA INSUSTRI BETON READY MIX
MF Toyfur
Citation : 0
Year : 0 |